Skip to main content

Lakeland Stormwater Management & Drainage Engineering

Lakeland drainage projects require coordination with Polk County and the Southwest Florida Water Management District (SWFWMD). CivilSmart's Licensed Professional Engineers deliver PE-stamped drainage designs, stormwater management plans, and permit services for Lakeland properties.

1,000+ Projects 100% Permit Approval Since 2004

Our Engineering Services in Lakeland

Licensed Professional Engineers delivering PE-stamped drainage designs, stormwater management, and permit services.

Residential Drainage Design

PE-stamped drainage plans for Lakeland homes. Yard flooding, pool drainage, grading permits, and stormwater management for residential properties.

Learn More

Commercial Stormwater

Commercial stormwater management for Lakeland developments. Site plans, detention/retention design, and SWFWMD ERP compliance.

Learn More

Permit Services

Full drainage permit management for Lakeland. SWFWMD ERP applications, and local permit processing.

Learn More

Lakeland Drainage Regulations

Governed by the Southwest Florida Water Management District (SWFWMD)

Local Stormwater Ordinance

Lakeland enforces its own stormwater ordinance with requirements that may exceed SWFWMD minimums. Projects must comply with both local and district standards.

Ordinance 3412 LDR

Ordinance 3412 LDR

Roadway/Drainage Standards Vol. 1

Roadway/Drainage Standards Vol. 1

$9.72/mo fee

$9.72/mo fee ($17.47 increase rejected)

Design Storm

25-year, 24-hour (open basins); 100-year, 24-hour (closed basins)

Stormwater Fee

$9.72/month

Special Requirements

  • Ordinance 3412 LDR
  • Roadway/Drainage Standards Vol. 1
  • $9.72/mo fee ($17.47 increase rejected)

How We Work in Lakeland

1

Contact & Consult

Describe your Lakeland drainage challenge. We assess your situation and outline the engineering approach.

2

Site Assessment

We evaluate your property, review existing conditions, survey elevations, and identify regulatory requirements.

3

Design & Engineering

Our licensed professional engineer creates SWFWMD-compliant drainage plans, PE-stamped and ready for permit submission.

4

Permit & Approval

We submit to SWFWMD and Lakeland, manage revisions, and deliver your approved drainage permit.

We engineer the solution — you get the approved permit.

Get Your Free Lakeland Drainage Quote

Leave your details and we'll reach out within 24 hours.

24-hour response guarantee. No obligation.

Lakeland Drainage Engineering FAQ

Drainage permit requirements in Lakeland depend on your project scope. Lakeland falls under the Southwest Florida Water Management District (SWFWMD), which administers Environmental Resource Permits (ERPs) for projects exceeding general permit thresholds. Professional engineering support is recommended for permit applications. CivilSmart handles the entire permitting process from design through approval.
Residential drainage design in Lakeland typically ranges from $3,000–$8,000 for standard properties, with complex projects (flood zones, retention/detention systems, large lots) ranging from $5,000–$15,000+. Commercial stormwater management starts at $10,000 and scales with project complexity. Every CivilSmart project begins with a free custom quote based on your specific property and regulatory requirements.
Lakeland drainage projects must comply with SWFWMD Environmental Resource Permit (ERP) requirements under Chapter 62-330, F.A.C. Additionally, Lakeland enforces its own local stormwater ordinance that may impose stricter requirements than state minimums. Key local requirements include: Ordinance 3412 LDR; Roadway/Drainage Standards Vol. 1. CivilSmart's engineers are experienced with all applicable Lakeland regulations.

Ready to Solve Your Lakeland Drainage Problem?

Get a free quote from Florida's drainage engineering specialists. PE-stamped plans, full permit coordination, and 100% approval rate.

Licensed Professional Engineers | 1,000+ Projects | 100% Permit Approval | Since 2004