Skip to main content

Tampa Stormwater Management & Drainage Engineering

Tampa drainage projects require coordination with Hillsborough County and the Southwest Florida Water Management District (SWFWMD). CivilSmart's Licensed Professional Engineers deliver PE-stamped drainage designs, stormwater management plans, and permit services for Tampa properties.

1,000+ Projects 100% Permit Approval Since 2004

Our Engineering Services in Tampa

Licensed Professional Engineers delivering PE-stamped drainage designs, stormwater management, and permit services.

Residential Drainage Design

PE-stamped drainage plans for Tampa homes. Yard flooding, pool drainage, grading permits, and stormwater management for residential properties.

Learn More

Commercial Stormwater

Commercial stormwater management for Tampa developments. Site plans, detention/retention design, and SWFWMD ERP compliance.

Learn More

Permit Services

Full drainage permit management for Tampa. SWFWMD ERP applications, tampa.gov (Accela) coordination, and local permit processing.

Learn More

Tampa Drainage Challenges

Tampa's SB 7040 net improvement requirement means traditional wet detention alone is no longer sufficient — enhanced BMPs including biofiltration systems are now mandated for new development. Located in the Northern Tampa Bay Basin, Tampa falls under SWFWMD's strictest drawdown criteria in the entire state. Hurricane Milton (2024) exceeded all design criteria in the area, driving active demand for drainage system upgrades.

SB 7040 compliance

Tampa's net improvement requirement in TN/TP/TSS means enhanced BMPs (biofiltration systems) are now mandated — traditional wet detention alone is insufficient.

Northern Tampa Bay Basin

SWFWMD's strictest drawdown criteria in the entire state apply in this basin — drainage designs must meet elevated performance standards.

Hurricane Milton recovery

The 2024 storm exceeded all design criteria — post-hurricane drainage upgrades are an active and urgent need across Tampa.

Chapter 27 LDC + Chapter 17 Utilities

Tampa's dual-chapter regulatory framework governs drainage requirements from both land development and utility perspectives.

Key Requirements

  • Chapter 27 LDC + Chapter 17 Utilities
  • ERP required
  • Net improvement in TN/TP/TSS
  • Enhanced BMPs (biofiltration) mandated
  • Accela Citizen Access portal

Tampa Drainage Regulations

Governed by the Southwest Florida Water Management District (SWFWMD)

Permit Thresholds

>1 acre redevelopment (SB 7040). City-specific beyond state/WMD not found.

Local Stormwater Ordinance

Tampa enforces its own stormwater ordinance with requirements that may exceed SWFWMD minimums. Projects must comply with both local and district standards.

Chapter 27 LDC + Chapter 17 Utilities

Chapter 27 LDC + Chapter 17 Utilities

ERP required

ERP required

Net improvement in TN/TP/TSS

Net improvement in TN/TP/TSS

Enhanced BMPs

Enhanced BMPs (biofiltration) mandated

Design Storm

25-year, 24-hour (open basins); 100-year, 24-hour (closed basins)

Retention Standard

>1 acre redevelopment (SB 7040). City-specific beyond state/WMD not found.

Permit Portal

tampa.gov (Accela)

Stormwater Fee

$47-86/year (county)

Special Requirements

  • Chapter 27 LDC + Chapter 17 Utilities
  • ERP required
  • Net improvement in TN/TP/TSS
  • Enhanced BMPs (biofiltration) mandated
  • Accela Citizen Access portal

How We Work in Tampa

1

Contact & Consult

Describe your Tampa drainage challenge. We assess your situation and outline the engineering approach.

2

Site Assessment

We evaluate your property, review existing conditions, survey elevations, and identify regulatory requirements.

3

Design & Engineering

Our licensed professional engineer creates SWFWMD-compliant drainage plans, PE-stamped and ready for permit submission.

4

Permit & Approval

We submit to SWFWMD and Tampa, manage revisions, and deliver your approved drainage permit.

We engineer the solution — you get the approved permit.

Get Your Free Tampa Drainage Quote

Leave your details and we'll reach out within 24 hours.

24-hour response guarantee. No obligation.

Tampa Drainage Engineering FAQ

Yes, Tampa requires drainage plans for development and redevelopment projects. Tampa falls under the Southwest Florida Water Management District (SWFWMD), which administers Environmental Resource Permits (ERPs) for projects exceeding general permit thresholds. A Licensed Professional Engineer must prepare and seal drainage designs for permit submission. Permits can be submitted through tampa.gov (Accela). CivilSmart handles the entire permitting process from design through approval.
Residential drainage design in Tampa typically ranges from $3,000–$8,000 for standard properties, with complex projects (flood zones, retention/detention systems, large lots) ranging from $5,000–$15,000+. Commercial stormwater management starts at $10,000 and scales with project complexity. Every CivilSmart project begins with a free custom quote based on your specific property and regulatory requirements.
Tampa drainage projects must comply with SWFWMD Environmental Resource Permit (ERP) requirements under Chapter 62-330, F.A.C. Additionally, Tampa enforces its own local stormwater ordinance that may impose stricter requirements than state minimums. Key local requirements include: Chapter 27 LDC + Chapter 17 Utilities; ERP required. CivilSmart's engineers are experienced with all applicable Tampa regulations.

Ready to Solve Your Tampa Drainage Problem?

Get a free quote from Florida's drainage engineering specialists. PE-stamped plans, full permit coordination, and 100% approval rate.

Licensed Professional Engineers | 1,000+ Projects | 100% Permit Approval | Since 2004